Triple

T8947517
Position Surface form Disambiguated ID Type / Status
Subject Bilbao tram E213258 entity
Predicate owner P347 FINISHED
Object Eusko Trenbideak E768420 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eusko Trenbideak | Statement: [Bilbao tram, owner, Eusko Trenbideak]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eusko Trenbideak
Context triple: [Bilbao tram, owner, Eusko Trenbideak]
  • A. Euskotren chosen
    Euskotren is the Basque Country’s public railway and tramway company, operating regional trains, metros, and tram services including those in Bilbao.
  • B. Renfe Operadora
    Renfe Operadora is Spain’s national state-owned railway company, responsible for operating most passenger and freight rail services across the country.
  • C. Renfe Cercanías
    Renfe Cercanías is Spain’s suburban and commuter rail service network, operating frequent regional trains that connect major cities with their surrounding metropolitan areas.
  • D. Renfe Mercancías
    Renfe Mercancías is the freight transport division of Spain’s national railway operator, specializing in the movement of goods by rail across the Iberian Peninsula and beyond.
  • E. Adif
    Adif is Spain’s state-owned railway infrastructure manager responsible for the construction, maintenance, and operation of most of the country’s rail network and stations.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca839843408190a39069a029a89f15 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc66deb8ec819087a9c5eddd24c08a completed April 1, 2026, 12:29 a.m.
NED1 Entity disambiguation (via context triple) batch_69cfc93c678c81909d2ab68308d7c2f0 completed April 3, 2026, 2:05 p.m.
Created at: March 30, 2026, 6:59 p.m.