Triple
T8946661
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | BB 22200 |
E213236
|
entity |
| Predicate | builder |
P3143
|
FINISHED |
| Object | Alsthom |
E264558
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Alsthom | Statement: [BB 22200, builder, Alsthom]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Alsthom Context triple: [BB 22200, builder, Alsthom]
-
A.
Alcatel Alsthom
chosen
Alcatel Alsthom was a major French industrial conglomerate active in telecommunications, power generation, and transport infrastructure before being restructured and rebranded as Alcatel.
-
B.
Alstom (formerly Bombardier Transportation)
Alstom (formerly Bombardier Transportation) is a major global rail transport manufacturer known for producing trains, trams, and related railway systems and equipment.
-
C.
Systra
Systra is a global engineering and consulting firm specializing in mass transit and rail infrastructure projects.
-
D.
Tractebel
Tractebel is an international engineering and consulting company specializing in energy, water, and infrastructure projects.
-
E.
Siemens Transportation Systems
Siemens Transportation Systems is a division of Siemens AG that designs and manufactures rail vehicles and related transportation infrastructure and technologies.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca839843408190a39069a029a89f15 |
completed | March 30, 2026, 2:07 p.m. |
| NER | Named-entity recognition | batch_69cc66dd00c481908ff20fd66c1954cc |
completed | April 1, 2026, 12:29 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cfc1fcb44481908324220aeba1f4e2 |
completed | April 3, 2026, 1:34 p.m. |
Created at: March 30, 2026, 6:59 p.m.