Triple
T8927925
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Piers 46–70 (Seattle) |
E212582
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | series of piers |
C5954
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: series of piers Context triple: [Piers 46–70 (Seattle), instanceOf, series of piers]
-
A.
waterfront pier complex
chosen
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
B.
group of bridges
A group of bridges is a collection of bridge structures considered together, typically related by location, design, function, or management context.
-
C.
fishing pier
A fishing pier is a raised structure extending from the shore over the water, designed to provide anglers with safe, convenient access to deeper fishing areas without using a boat.
-
D.
pair of bridges
A pair of bridges is a conceptual structure representing two interconnected or complementary pathways that together enable traversal or connection between separate points or domains.
-
E.
causeway-style bridge
A causeway-style bridge is a low, often long roadway structure built across water, wetlands, or low-lying terrain, typically supported by embankments or short spans rather than tall piers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8395c438819087d7cb844ab5990c |
completed | March 30, 2026, 2:07 p.m. |
Created at: March 30, 2026, 6:57 p.m.