Triple

T8914657
Position Surface form Disambiguated ID Type / Status
Subject Standing NATO Mine Countermeasures Group 1 E212266 entity
Predicate hasOperationalReadiness P49856 FINISHED
Object high LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: high | Statement: [Standing NATO Mine Countermeasures Group 1, hasOperationalReadiness, high]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasOperationalReadiness
Context triple: [Standing NATO Mine Countermeasures Group 1, hasOperationalReadiness, high]
  • A. operationalReadiness chosen
    Indicates that an entity is in a state where it is fully prepared, equipped, and able to perform its intended function or mission.
  • B. hasOperationalComponent
    Indicates that an entity includes, uses, or depends on another entity as a functional or operational part of its overall system or process.
  • C. fullyOperationalBy
    Indicates that an entity is expected or required to be completely functional and ready for use no later than a specified time or event.
  • D. declaredFullyOperationalBy
    Indicates that one entity has officially stated that another entity is completely ready and capable of functioning as intended.
  • E. isProductionReady
    Indicates that something has met all necessary quality, stability, and performance criteria to be safely deployed and used in a live production environment.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8393b1808190bd4336787ffa2c40 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc660e620c8190b02b9843c8f02bfa completed April 1, 2026, 12:25 a.m.
PD Predicate disambiguation batch_69cc5ecf55248190a29f00fbf99f13c4 completed March 31, 2026, 11:54 p.m.
Created at: March 30, 2026, 6:56 p.m.