Triple

T8898026
Position Surface form Disambiguated ID Type / Status
Subject Quaker City cruise E211853 entity
Predicate instanceOf P0 FINISHED
Object organized tour C22341 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: organized tour
Context triple: [Quaker City cruise, instanceOf, organized tour]
  • A. tourist excursion
    A tourist excursion is a planned short-term trip or outing designed to provide travelers with leisure, sightseeing, cultural experiences, or recreational activities at one or more destinations.
  • B. travel program chosen
    A travel program is a structured plan or organized set of services that coordinates transportation, accommodations, activities, and logistics to facilitate a complete travel experience for participants.
  • C. self-guided tour route
    A self-guided tour route is a predefined path or itinerary that visitors follow independently, using provided materials or digital tools for information and navigation without a live guide.
  • D. tourism organization
    A tourism organization is an entity that plans, promotes, and coordinates travel-related services and experiences to attract and serve visitors to specific destinations.
  • E. tour operator
    A tour operator is a business or individual that designs, organizes, and sells packaged travel experiences, coordinating transportation, accommodation, activities, and other services for travelers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83918d3081909b326fa3750cb8c8 completed March 30, 2026, 2:07 p.m.
Created at: March 30, 2026, 6:54 p.m.