Triple
T8891295
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | RFC 1 |
E211681
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | technical memorandum |
C1078
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: technical memorandum Context triple: [RFC 1, instanceOf, technical memorandum]
-
A.
technical report
chosen
A technical report is a structured document that presents methods, data, analysis, and conclusions about a specific technical or scientific investigation for a targeted audience.
-
B.
Technical specification
A technical specification is a detailed, formal document that precisely defines the functional, performance, and interface requirements of a system, component, or product to guide its design, implementation, and verification.
-
C.
technical subcommittee
A technical subcommittee is a specialized group within a larger organization tasked with analyzing, developing, and recommending solutions on specific technical issues or standards.
-
D.
technical book
A technical book is a structured, in-depth written work that explains specialized concepts, methods, or technologies in a specific field, often combining theory with practical examples and applications.
-
E.
technical draftsman
A technical draftsman is a professional who creates precise, detailed technical drawings and plans used to design, construct, or manufacture engineering and architectural projects.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83907954819096d52a245b635841 |
completed | March 30, 2026, 2:07 p.m. |
Created at: March 30, 2026, 6:54 p.m.