Triple
T8886095
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Buenos Aires Ecobici bike lanes |
E211534
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public bicycle-sharing network |
C18839
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public bicycle-sharing network Context triple: [Buenos Aires Ecobici bike lanes, instanceOf, public bicycle-sharing network]
-
A.
dock-based bike sharing scheme
chosen
A dock-based bike sharing scheme is a public transportation system where users borrow and return bicycles at fixed docking stations distributed across a city or region.
-
B.
ride system
A ride system is an integrated mechanical and control framework that transports guests or vehicles along a defined path or experience, coordinating motion, safety, and thematic elements.
-
C.
city network
A city network is an interconnected system of urban areas linked by transportation, communication, and economic relationships that facilitate the flow of people, goods, information, and services.
-
D.
cycle network
A cycle network is a graph structure in which nodes are connected in a closed loop so that each node is part of at least one simple cycle, enabling circular paths for flow, communication, or dependencies.
-
E.
fare network
A fare network is an interconnected system of transportation routes, services, and pricing structures through which passengers can travel using coordinated tickets or payment methods.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca838f9e20819096ab1f236a70381a |
completed | March 30, 2026, 2:07 p.m. |
Created at: March 30, 2026, 6:53 p.m.