Triple

T8863289
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 31W E210944 entity
Predicate connectsTo P845 FINISHED
Object Interstate 65 E26295 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 65 | Statement: [U.S. Route 31W, connectsTo, Interstate 65]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 65
Context triple: [U.S. Route 31W, connectsTo, Interstate 65]
  • A. Interstate 65 chosen
    Interstate 65 is a major north–south U.S. highway running through the central United States, connecting the Gulf Coast to the Midwest and serving key cities such as Mobile, Birmingham, Nashville, and Indianapolis.
  • B. Interstate 75
    Interstate 75 is a major north–south U.S. Interstate Highway running from southern Florida through several states in the Midwest to the Canadian border in Michigan.
  • C. Interstate 55
    Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
  • D. Interstate 69
    Interstate 69 is a major north–south U.S. highway that runs through multiple states in the Midwest and South, serving as an important regional and interstate transportation route.
  • E. Interstate 59
    Interstate 59 is a major U.S. highway running from Louisiana to Georgia, serving as a key north–south transportation corridor through the Deep South.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca838bbddc8190ab546d737e5d350f completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cc610416b48190a26f0c457089ffca completed April 1, 2026, 12:04 a.m.
NED1 Entity disambiguation (via context triple) batch_69d190aa70f0819088998b0e895ea36a completed April 4, 2026, 10:28 p.m.
Created at: March 30, 2026, 6:50 p.m.