Triple

T8858229
Position Surface form Disambiguated ID Type / Status
Subject Ueno Depot E210816 entity
Predicate instanceOf P0 FINISHED
Object train maintenance facility C23629 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: train maintenance facility
Context triple: [Ueno Depot, instanceOf, train maintenance facility]
  • A. rolling stock storage facility chosen
    A rolling stock storage facility is a dedicated area or building where railway vehicles such as locomotives and carriages are parked, secured, and sometimes lightly serviced when not in operation.
  • B. maintenance facility
    A maintenance facility is a dedicated location equipped with tools, resources, and personnel for inspecting, repairing, and servicing equipment, vehicles, or infrastructure to ensure their proper functioning and longevity.
  • C. rolling stock maintenance company
    A rolling stock maintenance company is an organization that inspects, services, repairs, and overhauls railway vehicles such as locomotives, passenger coaches, and freight wagons to ensure their safety, reliability, and regulatory compliance.
  • D. light rail operations facility
    A light rail operations facility is a specialized complex where light rail vehicles are stored, maintained, dispatched, and managed to support safe and efficient transit service.
  • E. railroad depot
    A railroad depot is a facility where trains load and unload passengers or freight, typically including platforms, waiting areas, and operational offices.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca838bbddc8190ab546d737e5d350f completed March 30, 2026, 2:07 p.m.
Created at: March 30, 2026, 6:50 p.m.