Triple
T8847614
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Oliver Smith |
E210545
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Broadway designer |
C5877
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Broadway designer Context triple: [Oliver Smith, instanceOf, Broadway designer]
-
A.
Broadway choreographer
A Broadway choreographer is a creative professional who designs, stages, and refines dance and movement sequences for musical theatre productions, integrating storytelling, music, and performers’ abilities into a cohesive visual performance.
-
B.
Broadway theater producer
A Broadway theater producer is a professional who secures financing, assembles creative and technical teams, oversees production logistics, and manages the business and artistic aspects of bringing a stage show to Broadway audiences.
-
C.
costume designer
A costume designer is a creative professional who conceptualizes, designs, and oversees the creation of clothing and accessories that define characters’ appearance in film, theater, television, or other performances.
-
D.
production designer
chosen
A production designer is the creative professional responsible for the overall visual concept of a film, television show, or theater production, overseeing sets, locations, props, and often collaborating closely with directors and cinematographers to establish the project’s look and feel.
-
E.
Broadway performer
A Broadway performer is a professional actor, singer, or dancer who appears in live theatrical productions on New York City's Broadway stage, combining high-level talent, discipline, and stage presence to bring characters and stories to life.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca838967bc8190b46c3c80a2887ea4 |
completed | March 30, 2026, 2:07 p.m. |
Created at: March 30, 2026, 6:49 p.m.