Triple

T8826852
Position Surface form Disambiguated ID Type / Status
Subject BB 26000 E210035 entity
Predicate usedFor P98 FINISHED
Object Corail passenger trains E210034 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Corail passenger trains | Statement: [BB 26000, usedFor, Corail passenger trains]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Corail passenger trains
Context triple: [BB 26000, usedFor, Corail passenger trains]
  • A. Corail coaches chosen
    Corail coaches are a class of long-distance passenger railway carriages widely used in France for comfortable intercity services.
  • B. Voyager trains
    Voyager trains are a family of high-speed diesel-electric multiple unit passenger trains widely used on intercity services in the UK rail network.
  • C. XPT train
    The XPT train is a long-distance, high-speed diesel passenger train used in New South Wales, Australia, based on the British InterCity 125 design.
  • D. MI 2N "Eole" trains
    The MI 2N "Eole" trains are double-deck electric multiple units designed for high-capacity suburban commuter service on the Paris RER network.
  • E. TGV Sud-Est trainset
    The TGV Sud-Est trainset is the original high-speed electric multiple unit used on France’s pioneering TGV services, known for inaugurating high-speed rail in the country in the early 1980s.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8365b28081909e48e45e95dfc405 completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc6034e8dc819099116d772e87569a completed April 1, 2026, midnight
NED1 Entity disambiguation (via context triple) batch_69cf895a766c81908f41e369afb05023 completed April 3, 2026, 9:33 a.m.
Created at: March 30, 2026, 6:46 p.m.