Triple
T8826807
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Corail coaches |
E210034
|
entity |
| Predicate | usedOnService |
P2367
|
FINISHED |
| Object | Paris–Limoges–Toulouse |
E210038
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Paris–Limoges–Toulouse | Statement: [Corail coaches, usedOnService, Paris–Limoges–Toulouse]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Paris–Limoges–Toulouse Context triple: [Corail coaches, usedOnService, Paris–Limoges–Toulouse]
-
A.
Paris–Limoges–Toulouse
chosen
Paris–Limoges–Toulouse is a major French intercity rail corridor linking the capital Paris with the central city of Limoges and the southwestern city of Toulouse.
-
B.
Bordeaux–Toulouse–Marseille
Bordeaux–Toulouse–Marseille is a major French intercity rail corridor linking the Atlantic city of Bordeaux with Toulouse and the Mediterranean port of Marseille.
-
C.
Paris–Marseille
Paris–Marseille is a major French intercity rail corridor linking the capital Paris with the Mediterranean port city of Marseille.
-
D.
Paris–Toulouse
Paris–Toulouse is a major intercity rail corridor in France linking the capital Paris with the southwestern city of Toulouse.
-
E.
Toulouse–Hendaye
Toulouse–Hendaye is a French intercity rail route linking the inland city of Toulouse with the Atlantic coastal town of Hendaye near the Spanish border.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8365b28081909e48e45e95dfc405 |
completed | March 30, 2026, 2:06 p.m. |
| NER | Named-entity recognition | batch_69cc6034e8dc819099116d772e87569a |
completed | April 1, 2026, midnight |
| NED1 | Entity disambiguation (via context triple) | batch_69cf895a766c81908f41e369afb05023 |
completed | April 3, 2026, 9:33 a.m. |
Created at: March 30, 2026, 6:46 p.m.