Triple
T8820275
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Queen Street Mill |
E209886
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | steam-powered mill |
C25124
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: steam-powered mill Context triple: [Queen Street Mill, instanceOf, steam-powered mill]
-
A.
water-powered mill
A water-powered mill is a structure that uses the energy of flowing or falling water, typically via a waterwheel or turbine, to drive mechanical processes such as grinding grain, sawing wood, or generating power.
-
B.
rolling mill
A rolling mill is an industrial machine that shapes metal by passing it between pairs of rotating rolls to reduce thickness, change cross-section, or impart a desired surface finish.
-
C.
steam-powered railway
A steam-powered railway is a transportation system in which trains are propelled along tracks by locomotives that generate mechanical power from steam produced by boiling water, typically using coal or other fuels.
-
D.
windmill
A windmill is a structure that converts the kinetic energy of wind into mechanical energy, traditionally used for tasks such as grinding grain, pumping water, or generating electricity.
-
E.
sawmill
A sawmill is an industrial facility where logs are processed and cut into lumber and other wood products using mechanized saws and related equipment.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8364e13081909c85fe80f44fe86f |
completed | March 30, 2026, 2:06 p.m. |
Created at: March 30, 2026, 6:46 p.m.