Triple

T8814650
Position Surface form Disambiguated ID Type / Status
Subject Continuity Sketch E209747 entity
Predicate instanceOf P0 FINISHED
Object design collaboration tool C7303 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: design collaboration tool
Context triple: [Continuity Sketch, instanceOf, design collaboration tool]
  • A. design collaboration
    Design collaboration is the process by which multiple stakeholders—such as designers, clients, developers, and users—work together iteratively to create, refine, and align on effective design solutions.
  • B. prototyping tool
    A prototyping tool is a software application or platform that enables users to quickly create, visualize, and test interactive mockups or early versions of products, interfaces, or systems before full-scale development.
  • C. design center
    A design center is a dedicated space or facility where customers and professionals can explore, plan, and coordinate design elements such as materials, finishes, and layouts for projects like homes, interiors, or products.
  • D. user experience design tool chosen
    A user experience design tool is a software application that enables designers to plan, prototype, test, and refine digital product interfaces and interactions to optimize usability and user satisfaction.
  • E. project management tool
    A project management tool is a software application that helps plan, organize, track, and collaborate on tasks and resources to achieve project goals efficiently.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8363f3308190a47e3f1ebd51f613 completed March 30, 2026, 2:06 p.m.
Created at: March 30, 2026, 6:45 p.m.