Triple
T8807464
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Howrah–Nagpur–Mumbai line |
E209568
|
entity |
| Predicate | partOf |
P40
|
FINISHED |
| Object | Golden Quadrilateral railway network of India |
E718353
|
NE FINISHED |
Disambiguation candidates (1 decision)
The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Golden Quadrilateral railway network of India Context triple: [Howrah–Nagpur–Mumbai line, partOf, Golden Quadrilateral railway network of India]
-
A.
Golden Quadrilateral railway network
chosen
The Golden Quadrilateral railway network is a major Indian Railways route system that interconnects key metropolitan cities in a quadrilateral pattern to facilitate high-volume passenger and freight movement.
-
B.
Delhi–Kolkata rail corridor
The Delhi–Kolkata rail corridor is one of India’s busiest and most important railway routes, linking the national capital with the eastern metropolis through major northern and eastern cities.
-
C.
Golden Quadrilateral
The Golden Quadrilateral is a major highway network in India that connects the four metropolitan cities of Delhi, Mumbai, Chennai, and Kolkata in a large loop to facilitate faster transport and economic integration.
-
D.
Chennai–Kolkata railway corridor
The Chennai–Kolkata railway corridor is a major Indian rail route connecting the southeastern metropolis of Chennai with the eastern city of Kolkata, serving as a key artery for passenger and freight transport along the east coast.
-
E.
Delhi–Mumbai line
The Delhi–Mumbai line is one of India’s busiest and most important railway corridors, connecting the national capital New Delhi with the financial hub Mumbai and passing through major cities in northern and western India.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69ca836320e48190b5cf585b90a322c4 |
elicitation | completed |
| NER | batch_69cc5fd2fadc81908b27e9296885af2b |
ner | completed |
| NED1 | batch_69cf6fa0e4308190bd01c2d107c8c02d |
ned_source_triple | completed |
Created at: March 30, 2026, 6:45 p.m.