Triple
T8803697
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ATA-4 |
E209471
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | IDE interface specification |
C6413
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: IDE interface specification Context triple: [ATA-4, instanceOf, IDE interface specification]
-
A.
system interface specification
chosen
A system interface specification is a detailed description of how different system components or external systems interact, defining the data formats, protocols, operations, and constraints that govern their communication.
-
B.
open source software interface
An open source software interface is a publicly accessible set of interaction points, such as APIs or user interfaces, whose underlying code is openly available for use, modification, and distribution under an open source license.
-
C.
interoperability specification suite
An interoperability specification suite is a coordinated set of technical standards, protocols, and guidelines designed to ensure that diverse systems, components, or organizations can reliably exchange and correctly interpret data and functionality.
-
D.
integrated development environment component
An integrated development environment component is a modular tool or feature within an IDE that provides specific functionality—such as code editing, debugging, or project management—to support and streamline software development.
-
E.
standardized rail interface
A standardized rail interface is a uniform physical and electrical connection system that allows different rail vehicles, components, or infrastructure elements to interoperate safely and efficiently across multiple networks or manufacturers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca836320e48190b5cf585b90a322c4 |
completed | March 30, 2026, 2:06 p.m. |
Created at: March 30, 2026, 6:44 p.m.