Triple

T8794987
Position Surface form Disambiguated ID Type / Status
Subject Companhia Caminho Aéreo Pão de Açúcar E209267 entity
Predicate instanceOf P0 FINISHED
Object cable car operator C6404 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cable car operator
Context triple: [Companhia Caminho Aéreo Pão de Açúcar, instanceOf, cable car operator]
  • A. cable car pioneer
    A cable car pioneer is an innovator who develops, implements, or significantly advances early cable-driven transportation systems for people or goods.
  • B. cable car station
    A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
  • C. crane operator
    A crane operator is a skilled worker who controls and maneuvers cranes to lift, move, and position heavy materials safely and precisely on construction or industrial sites.
  • D. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • E. transport infrastructure operator chosen
    A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca836240888190a62b262e56a69d2f completed March 30, 2026, 2:06 p.m.
Created at: March 30, 2026, 6:43 p.m.