Triple
T8787634
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Slovakia and Hungary |
E209079
|
entity |
| Predicate | shareEnergyCooperation |
P67782
|
FINISHED |
| Object | gas transit infrastructure |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: gas transit infrastructure | Statement: [Slovakia and Hungary, shareEnergyCooperation, gas transit infrastructure]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: shareEnergyCooperation Context triple: [Slovakia and Hungary, shareEnergyCooperation, gas transit infrastructure]
-
A.
energyCooperation
chosen
Indicates a collaborative relationship in which entities work together to share, develop, or manage energy resources, technologies, or policies.
-
B.
renewableEnergyShare
Indicates the proportion of total energy consumption or production that comes from renewable energy sources.
-
C.
energyAspect
Indicates a relationship where one entity represents an aspect, component, or characteristic related to the energy properties or behavior of another entity.
-
D.
sharesPowerWith
Indicates that two or more entities jointly hold, exercise, or distribute authority or control in a shared manner.
-
E.
energyProjectsInclude
Indicates that a broader set of energy-related initiatives or plans contains or encompasses specific individual energy projects.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca836168108190bb43d3dc235c1f55 |
completed | March 30, 2026, 2:06 p.m. |
| NER | Named-entity recognition | batch_69cc5f89a84c819085d4cfe4e6dfbda8 |
completed | March 31, 2026, 11:58 p.m. |
| PD | Predicate disambiguation | batch_69cc5c1d48f08190b325a77d4c76d223 |
completed | March 31, 2026, 11:43 p.m. |
Created at: March 30, 2026, 6:43 p.m.