Triple

T8787634
Position Surface form Disambiguated ID Type / Status
Subject Slovakia and Hungary E209079 entity
Predicate shareEnergyCooperation P67782 FINISHED
Object gas transit infrastructure LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: gas transit infrastructure | Statement: [Slovakia and Hungary, shareEnergyCooperation, gas transit infrastructure]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: shareEnergyCooperation
Context triple: [Slovakia and Hungary, shareEnergyCooperation, gas transit infrastructure]
  • A. energyCooperation chosen
    Indicates a collaborative relationship in which entities work together to share, develop, or manage energy resources, technologies, or policies.
  • B. renewableEnergyShare
    Indicates the proportion of total energy consumption or production that comes from renewable energy sources.
  • C. energyAspect
    Indicates a relationship where one entity represents an aspect, component, or characteristic related to the energy properties or behavior of another entity.
  • D. sharesPowerWith
    Indicates that two or more entities jointly hold, exercise, or distribute authority or control in a shared manner.
  • E. energyProjectsInclude
    Indicates that a broader set of energy-related initiatives or plans contains or encompasses specific individual energy projects.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca836168108190bb43d3dc235c1f55 completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc5f89a84c819085d4cfe4e6dfbda8 completed March 31, 2026, 11:58 p.m.
PD Predicate disambiguation batch_69cc5c1d48f08190b325a77d4c76d223 completed March 31, 2026, 11:43 p.m.
Created at: March 30, 2026, 6:43 p.m.