Triple

T8774580
Position Surface form Disambiguated ID Type / Status
Subject Natur-Park Schöneberger Südgelände E208545 entity
Predicate instanceOf P0 FINISHED
Object former railway facility C25042 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: former railway facility
Context triple: [Natur-Park Schöneberger Südgelände, instanceOf, former railway facility]
  • A. former railway station
    A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
  • B. former railroad warehouse
    A former railroad warehouse is a large, often brick or timber industrial building originally used for storing and transferring freight to and from trains, now frequently repurposed for commercial, residential, or cultural uses.
  • C. railroad depot
    A railroad depot is a facility where trains load and unload passengers or freight, typically including platforms, waiting areas, and operational offices.
  • D. rolling stock storage facility
    A rolling stock storage facility is a dedicated area or building where railway vehicles such as locomotives and carriages are parked, secured, and sometimes lightly serviced when not in operation.
  • E. former name of railway station
    A former name of a railway station is a historical designation previously used to identify a specific station before it was officially renamed or rebranded.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca835edb4481909b4aafb616dc5eb7 completed March 30, 2026, 2:06 p.m.
Created at: March 30, 2026, 6:41 p.m.