Triple
T8755786
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | YANG actions |
E208069
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | YANG language construct |
C7822
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: YANG language construct Context triple: [YANG actions, instanceOf, YANG language construct]
-
A.
YANG data model standard
A YANG data model standard is a formal, structured language used to model configuration and state data for network devices and services in a vendor-neutral, interoperable way.
-
B.
syntax specification language
A syntax specification language is a formal notation used to define the grammatical structure and valid constructs of a programming or data language.
-
C.
network configuration language
chosen
A network configuration language is a specialized syntax and set of constructs used to define, manage, and automate the settings, policies, and behaviors of network devices and services.
-
D.
lexical grammar
Lexical grammar is the set of rules that define how characters in a language’s source code are grouped into meaningful tokens such as identifiers, keywords, literals, and operators.
-
E.
formal language specification
A formal language specification is a precise, mathematically defined description of the syntax and structure of a language, typically using grammars and formal rules to unambiguously determine which strings belong to the language.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca835cd6b08190bd7c63db92f53c86 |
completed | March 30, 2026, 2:06 p.m. |
Created at: March 30, 2026, 6:39 p.m.