Triple
T8754720
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Krasnoye Sormovo Shipyard |
E208045
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | shipbuilding enterprise |
C13841
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: shipbuilding enterprise Context triple: [Krasnoye Sormovo Shipyard, instanceOf, shipbuilding enterprise]
-
A.
shipbuilding firm
chosen
A shipbuilding firm is a company that designs, constructs, and sometimes repairs ships and other marine vessels for commercial, military, or private use.
-
B.
shipbuilding facility
A shipbuilding facility is an industrial site equipped with specialized infrastructure, tools, and workforce for designing, constructing, and outfitting ships and other large marine vessels.
-
C.
shipbuilder
A shipbuilder is a professional or company that designs, constructs, and repairs ships and other marine vessels, coordinating engineering, materials, and labor to ensure seaworthy and efficient watercraft.
-
D.
historic shipyard
A historic shipyard is a preserved maritime industrial site where ships were once designed, built, repaired, and launched, often retaining original structures, tools, and waterfront infrastructure that reflect its historical significance.
-
E.
capital ship
A capital ship is a large, heavily armed and armored warship that serves as a navy’s primary offensive and command vessel in fleet operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca835cd6b08190bd7c63db92f53c86 |
completed | March 30, 2026, 2:06 p.m. |
Created at: March 30, 2026, 6:39 p.m.