Triple

T8715975
Position Surface form Disambiguated ID Type / Status
Subject Pacific locks section E206894 entity
Predicate instanceOf P0 FINISHED
Object part of Panama Canal C8708 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: part of Panama Canal
Context triple: [Pacific locks section, instanceOf, part of Panama Canal]
  • A. Panama Canal infrastructure chosen
    Panama Canal infrastructure encompasses the system of locks, channels, dams, ports, support facilities, and control technologies that enable the transit, management, and maintenance of maritime traffic through the Panama Canal.
  • B. province of Panama
    A province of Panama is a primary administrative division of the country, governed by a provincial authority and comprising multiple districts and local communities within a defined geographic area.
  • C. Panama Canal engineer
    A Panama Canal engineer is a professional responsible for designing, maintaining, and optimizing the canal’s complex system of locks, channels, and supporting infrastructure to ensure safe and efficient maritime transit between the Atlantic and Pacific Oceans.
  • D. canal basin
    A canal basin is a widened, often enclosed section of a canal used for mooring, turning, loading, unloading, and managing waterborne traffic.
  • E. navigable waterway
    A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83572d4881909bef3be2b578d539 completed March 30, 2026, 2:06 p.m.
Created at: March 30, 2026, 6:35 p.m.