Triple
T8715974
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pacific locks section |
E206894
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | canal infrastructure section |
C16044
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: canal infrastructure section Context triple: [Pacific locks section, instanceOf, canal infrastructure section]
-
A.
canal infrastructure
chosen
Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
-
B.
canal structure
A canal structure is a man-made or modified waterway feature, such as locks, gates, culverts, or embankments, designed to control, direct, or facilitate the flow and navigation of water within a canal system.
-
C.
canal authority
A canal authority is an organization responsible for managing, operating, and regulating a canal and its associated waterways, infrastructure, and traffic.
-
D.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
E.
canal bridge
A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83572d4881909bef3be2b578d539 |
completed | March 30, 2026, 2:06 p.m. |
Created at: March 30, 2026, 6:35 p.m.