Triple

T8709822
Position Surface form Disambiguated ID Type / Status
Subject Missouri Route 291 E206745 entity
Predicate hasJunctionWith P1018 FINISHED
Object Interstate 435 E21316 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 435 | Statement: [Missouri Route 291, hasJunctionWith, Interstate 435]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 435
Context triple: [Missouri Route 291, hasJunctionWith, Interstate 435]
  • A. Interstate 435 chosen
    Interstate 435 is a beltway highway that encircles the Kansas City metropolitan area, facilitating regional traffic flow and access to surrounding suburbs.
  • B. Interstate 135
    Interstate 135 is a north–south auxiliary Interstate Highway in Kansas that connects Wichita to Interstate 70 near Salina.
  • C. Interstate 235
    Interstate 235 is an auxiliary Interstate Highway that serves as a major east–west freeway through Des Moines, Iowa, connecting the city's downtown and surrounding suburbs to the regional Interstate network.
  • D. Interstate 355
    Interstate 355 is a toll highway in the Chicago metropolitan area that serves as a suburban north–south bypass around the city.
  • E. Interstate 335
    Interstate 335 is a segment of the Kansas Turnpike that serves as a key north–south connector route in eastern Kansas.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca835645e881908f00e3c8b51da81d completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc5c3034708190b895eaf890d62198 completed March 31, 2026, 11:43 p.m.
NED1 Entity disambiguation (via context triple) batch_69cf28c174008190bc2d43ca613e9a9e completed April 3, 2026, 2:41 a.m.
Created at: March 30, 2026, 6:35 p.m.