Triple
T8693634
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Urbanized Area Formula Program |
E206351
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public transportation grant program |
C15006
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public transportation grant program Context triple: [Urbanized Area Formula Program, instanceOf, public transportation grant program]
-
A.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
B.
public transportation agency
A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
-
C.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
D.
transportation assistance program
chosen
A transportation assistance program is a coordinated service that helps individuals access affordable, reliable travel options—such as public transit, rideshares, or specialized vehicles—to reach essential destinations like work, school, and medical appointments.
-
E.
rail transit
Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca835481fc819084e33d3bc883bfa6 |
completed | March 30, 2026, 2:06 p.m. |
Created at: March 30, 2026, 6:33 p.m.