Triple

T8693633
Position Surface form Disambiguated ID Type / Status
Subject Urbanized Area Formula Program E206351 entity
Predicate instanceOf P0 FINISHED
Object federal transit funding program C357 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: federal transit funding program
Context triple: [Urbanized Area Formula Program, instanceOf, federal transit funding program]
  • A. highway funding program
    A highway funding program is a structured governmental initiative that allocates financial resources for the planning, construction, maintenance, and improvement of highway infrastructure.
  • B. transportation funding authorization act
    A transportation funding authorization act is a legislative measure that approves and allocates financial resources for the planning, construction, operation, and maintenance of transportation infrastructure and related programs over a specified period.
  • C. public transit and highway improvement program
    A public transit and highway improvement program is a coordinated set of projects and policies designed to enhance the capacity, safety, efficiency, and accessibility of transportation networks through upgrades to roads, highways, and mass transit systems.
  • D. federal government program chosen
    A federal government program is an organized set of activities, services, or regulations funded and administered by the national government to achieve specific public policy goals.
  • E. air transportation subsidy program
    An air transportation subsidy program is a structured governmental or organizational initiative that provides financial support to airlines or routes to ensure the availability, affordability, and continuity of air services that might otherwise be economically unsustainable.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca835481fc819084e33d3bc883bfa6 completed March 30, 2026, 2:06 p.m.
Created at: March 30, 2026, 6:33 p.m.