Triple

T8686662
Position Surface form Disambiguated ID Type / Status
Subject Dniester Hydroelectric Station E206176 entity
Predicate hasPart P35 FINISHED
Object Dniester Dam E208475 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dniester Dam | Statement: [Dniester Hydroelectric Station, hasPart, Dniester Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dniester Dam
Context triple: [Dniester Hydroelectric Station, hasPart, Dniester Dam]
  • A. Dubăsari Dam chosen
    Dubăsari Dam is a hydroelectric dam and reservoir complex on the Dniester River in Moldova, used for power generation, irrigation, and water regulation.
  • B. Mozhaysk Dam
    Mozhaysk Dam is a hydraulic structure in Russia that impounds the Mozhaysk Reservoir, serving regional water supply, flood control, and related purposes.
  • C. Solina Dam
    Solina Dam is a major hydroelectric and flood-control dam in southeastern Poland, known for creating the large artificial Solina Lake in the Bieszczady region.
  • D. Dniester Reservoir
    The Dniester Reservoir is a large artificial lake on the Dniester River, created for hydroelectric power generation, water regulation, and related economic uses.
  • E. Kakhovka Reservoir
    Kakhovka Reservoir is a large artificial lake on the lower Dnieper River in southern Ukraine, created by the Kakhovka Hydroelectric Power Plant dam and used for irrigation, water supply, and power generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca835481fc819084e33d3bc883bfa6 completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc5730309081909a9a0256c9bf5f8f completed March 31, 2026, 11:22 p.m.
NED1 Entity disambiguation (via context triple) batch_69cf6edeef308190b6acfe324552b1cf completed April 3, 2026, 7:40 a.m.
Created at: March 30, 2026, 6:33 p.m.