Triple

T8683131
Position Surface form Disambiguated ID Type / Status
Subject Tsalka E206086 entity
Predicate hasNearbyFeature P350 FINISHED
Object Tsalka Reservoir E751249 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tsalka Reservoir | Statement: [Tsalka, hasNearbyFeature, Tsalka Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tsalka Reservoir
Context triple: [Tsalka, hasNearbyFeature, Tsalka Reservoir]
  • A. Tsalka Reservoir chosen
    Tsalka Reservoir is an artificial lake in the Tsalka region of southern Georgia, primarily used for irrigation, hydropower, and local water supply.
  • B. Kurpsai Reservoir
    Kurpsai Reservoir is an artificial lake on the Naryn River in Kyrgyzstan, created for hydroelectric power generation and water regulation.
  • C. Koka Reservoir
    Koka Reservoir is a major artificial lake in Ethiopia formed by the Koka Dam on the Awash River, serving as an important source of hydroelectric power, irrigation, and fisheries.
  • D. Jurala Reservoir
    Jurala Reservoir is a major water storage body in Telangana, India, created by the Priyadarshini Jurala Dam on the Krishna River for irrigation, power generation, and regional water supply.
  • E. Plavinas Reservoir
    Plavinas Reservoir is an artificial lake in Latvia formed on the Daugava River to support the operations of the Plavinas Hydroelectric Power Plant.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca835379688190aa06b9d98e684d58 completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc4ae9da3c8190866e24970a7aeba3 completed March 31, 2026, 10:30 p.m.
NED1 Entity disambiguation (via context triple) batch_69cf287f05748190b41c606eaae5d0b7 completed April 3, 2026, 2:39 a.m.
Created at: March 30, 2026, 6:32 p.m.