Triple

T8659070
Position Surface form Disambiguated ID Type / Status
Subject Xiamen–Shenzhen Railway E205499 entity
Predicate railwayLineStatus P41715 FINISHED
Object in operation LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: in operation | Statement: [Xiamen–Shenzhen Railway, railwayLineStatus, in operation]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: railwayLineStatus
Context triple: [Xiamen–Shenzhen Railway, railwayLineStatus, in operation]
  • A. railStatus chosen
    Indicates the current operational condition or state of a rail-related entity (such as a track, line, or service) within the system.
  • B. railwayLineNow
    Indicates that a previously existing railway line has been replaced, succeeded, or is currently represented by a new or different railway line.
  • C. railLineStatusAfterward
    Indicates the condition or operational status of a rail line after a specified event or time period has occurred.
  • D. railwayLineUsage
    Indicates how a railway line is used, such as the type or purpose of traffic or operations it supports.
  • E. railwayTraffic
    Indicates the presence, flow, or management of train movements along railway lines between locations.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8350897c819086cde7596fbe5fe7 completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc486ece68819089c74bdf98b64490 completed March 31, 2026, 10:19 p.m.
PD Predicate disambiguation batch_69cc4564e018819081036722f3e42a71 completed March 31, 2026, 10:06 p.m.
Created at: March 30, 2026, 6:30 p.m.