Triple
T8651186
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dandora dumpsite |
E205101
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Open-air garbage dump |
C24814
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Open-air garbage dump Context triple: [Dandora dumpsite, instanceOf, Open-air garbage dump]
-
A.
demolished building site
A demolished building site is an area where a structure has been recently torn down, typically characterized by rubble, exposed foundations, construction equipment, and preparations for clearance or redevelopment.
-
B.
open space park
An open space park is a large, predominantly undeveloped public area preserved for recreation, natural habitat, and scenic enjoyment.
-
C.
public gathering area
A public gathering area is a designated space where people can come together for social interaction, events, recreation, or community activities.
-
D.
trailer park
A trailer park is a designated residential area where multiple mobile homes or trailers are situated in close proximity, often sharing communal utilities and amenities.
-
E.
former gravel pit
A former gravel pit is a previously excavated site where gravel was extracted, now typically abandoned, reclaimed, or repurposed for new land uses such as recreation, habitat restoration, or development.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca834e56848190abb0eeaec9dedd32 |
completed | March 30, 2026, 2:06 p.m. |
Created at: March 30, 2026, 6:29 p.m.