Triple
T8639111
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Okhla |
E204597
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object | Okhla Phase III |
E204601
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Okhla Phase III | Statement: [Okhla, hasPart, Okhla Phase III]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Okhla Phase III Context triple: [Okhla, hasPart, Okhla Phase III]
-
A.
Kalpasar project
The Kalpasar project is a proposed large-scale dam and freshwater reservoir scheme in Gujarat, India, intended to store Narmada River waters, provide irrigation and drinking water, and improve regional infrastructure.
-
B.
BHELMA III
BHELMA III is a Spanish Army helicopter maneuver battalion specializing in air mobility, transport, and support operations.
-
C.
Okhla Industrial Area
chosen
Okhla Industrial Area is a major industrial and commercial hub in South Delhi, known for its manufacturing units, offices, and business parks.
-
D.
Port Qasim Coal Power Project
The Port Qasim Coal Power Project is a major coal-fired power plant in Pakistan developed under the China–Pakistan Economic Corridor to help address the country’s electricity shortages.
-
E.
Project Shivalik
Project Shivalik is a field formation of India’s Border Roads Organisation responsible for constructing and maintaining strategic road infrastructure in the Shivalik and adjoining Himalayan regions.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca834ca1c88190a11ffb0200342fac |
completed | March 30, 2026, 2:06 p.m. |
| NER | Named-entity recognition | batch_69cc47650a14819094855aa8d062ebbc |
completed | March 31, 2026, 10:15 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cef354c5c08190bf7d3023a3473d2f |
completed | April 2, 2026, 10:53 p.m. |
Created at: March 30, 2026, 6:28 p.m.