Triple

T8639109
Position Surface form Disambiguated ID Type / Status
Subject Okhla E204597 entity
Predicate hasPart P35 FINISHED
Object Okhla Phase I E204597 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Okhla Phase I | Statement: [Okhla, hasPart, Okhla Phase I]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Okhla Phase I
Context triple: [Okhla, hasPart, Okhla Phase I]
  • A. Kalpasar project
    The Kalpasar project is a proposed large-scale dam and freshwater reservoir scheme in Gujarat, India, intended to store Narmada River waters, provide irrigation and drinking water, and improve regional infrastructure.
  • B. Priyadarshini Jurala Project
    Priyadarshini Jurala Project is a major multipurpose irrigation and hydroelectric dam project on the Krishna River in Telangana, India.
  • C. Okhla Industrial Area
    Okhla Industrial Area is a major industrial and commercial hub in South Delhi, known for its manufacturing units, offices, and business parks.
  • D. Okhla chosen
    Okhla is a locality in South Delhi, India, known for its industrial areas, residential colonies, and proximity to the Yamuna River.
  • E. Project Vartak
    Project Vartak is a key Border Roads Organisation project responsible for developing and maintaining strategic road infrastructure in India’s northeastern border regions.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca834ca1c88190a11ffb0200342fac completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc47650a14819094855aa8d062ebbc completed March 31, 2026, 10:15 p.m.
NED1 Entity disambiguation (via context triple) batch_69cebc2c2b84819087a9f23b47c607e8 completed April 2, 2026, 6:57 p.m.
Created at: March 30, 2026, 6:28 p.m.