Triple

T8638114
Position Surface form Disambiguated ID Type / Status
Subject Didcot Power Station E204572 entity
Predicate operatedBy P86 FINISHED
Object RWE npower E226682 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RWE npower | Statement: [Didcot Power Station, operatedBy, RWE npower]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: RWE npower
Context triple: [Didcot Power Station, operatedBy, RWE npower]
  • A. RWE chosen
    RWE is a major German energy company that operates internationally, with significant investments in renewable power generation such as large offshore wind farms.
  • B. EDF Energy
    EDF Energy is a major UK-based energy company that generates and supplies electricity and gas, particularly known for operating nuclear power stations and low-carbon energy assets.
  • C. Centrica
    Centrica is a British multinational energy and services company best known as the owner of British Gas and a major supplier of gas and electricity in the UK and Ireland.
  • D. Npower Renewables
    Npower Renewables is a UK-based renewable energy company specializing in the development and operation of wind power projects, including offshore wind farms.
  • E. Northern Powergrid
    Northern Powergrid is a UK-based electricity distribution network operator responsible for delivering power to homes and businesses across the North East, Yorkshire, and northern Lincolnshire.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca834b903c8190add96cc651e1a477 completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cc4763b6dc81908de979e6d8158bd9 completed March 31, 2026, 10:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69ceccaa77688190bbcf3fbd6af7c195 completed April 2, 2026, 8:08 p.m.
Created at: March 30, 2026, 6:28 p.m.