Triple

T8612978
Position Surface form Disambiguated ID Type / Status
Subject THEARC E203959 entity
Predicate instanceOf P0 FINISHED
Object arts and education campus C16315 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: arts and education campus
Context triple: [THEARC, instanceOf, arts and education campus]
  • A. campus chosen
    A campus is a defined area of land that houses the buildings, facilities, and open spaces of an educational institution, supporting academic, residential, and social activities.
  • B. arts school
    An arts school is an educational institution dedicated to teaching and nurturing creative disciplines such as visual arts, music, theater, dance, and related fields through specialized instruction and practice.
  • C. government campus
    A government campus is a designated area comprising multiple buildings and facilities where various governmental departments and agencies are co-located to conduct administrative, legislative, or public service functions.
  • D. education museum
    An education museum is a public institution that collects, preserves, and interprets artifacts, exhibits, and programs specifically designed to support learning and teaching across diverse subjects and audiences.
  • E. public educational facility
    A public educational facility is a government-funded institution that provides accessible learning environments, resources, and instruction to students within a community or region.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca832c23e4819095a9f3eea4a21828 completed March 30, 2026, 2:05 p.m.
Created at: March 30, 2026, 6:25 p.m.