Triple

T8608658
Position Surface form Disambiguated ID Type / Status
Subject GTK E203866 entity
Predicate instanceOf P0 FINISHED
Object GNOME project component C8837 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: GNOME project component
Context triple: [GTK, instanceOf, GNOME project component]
  • A. division of the GNU Project
    A division of the GNU Project is an organizational unit within the GNU initiative that focuses on developing, maintaining, or coordinating a specific subset of GNU software, documentation, or related activities.
  • B. W3C software project
    A W3C software project is an open, collaboratively developed software initiative under the World Wide Web Consortium that implements, tests, or supports W3C web standards and technologies.
  • C. Red Hat product component
    A Red Hat product component is an individual software module, service, or feature within a Red Hat offering that delivers specific functionality and can be developed, maintained, and versioned independently.
  • D. Apache Software Foundation project
    An Apache Software Foundation project is an open-source software initiative governed by the ASF’s community-driven, meritocratic processes and licensed under the Apache License.
  • E. graphical user interface framework chosen
    A graphical user interface framework is a collection of tools, libraries, and components that simplifies building, organizing, and managing interactive visual elements of software applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca832c23e4819095a9f3eea4a21828 completed March 30, 2026, 2:05 p.m.
Created at: March 30, 2026, 6:25 p.m.