Triple
T8605917
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Planetarium at Rock Creek Park Nature Center |
E203794
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public astronomy facility |
C1469
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public astronomy facility Context triple: [Planetarium at Rock Creek Park Nature Center, instanceOf, public astronomy facility]
-
A.
astronomical observatory
An astronomical observatory is a facility equipped with specialized instruments and structures designed to observe, record, and analyze celestial objects and phenomena.
-
B.
observatory
chosen
An observatory is a facility equipped with specialized instruments and structures designed for systematically observing and recording natural phenomena, typically in astronomy or atmospheric science.
-
C.
ESA facility
An ESA facility is a specialized location, infrastructure, or installation operated or supported by the European Space Agency to conduct space-related research, development, testing, mission operations, or support services.
-
D.
astronomical instrument
An astronomical instrument is a specialized device or tool designed to observe, measure, or analyze celestial objects and phenomena.
-
E.
astronomical research institute
An astronomical research institute is an organization dedicated to the systematic study of celestial objects and phenomena through observation, theory, and instrumentation development.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca832c23e4819095a9f3eea4a21828 |
completed | March 30, 2026, 2:05 p.m. |
Created at: March 30, 2026, 6:25 p.m.