Triple

T8599240
Position Surface form Disambiguated ID Type / Status
Subject Tom Akers E203631 entity
Predicate spaceMission P68 FINISHED
Object STS-79 E516585 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: STS-79 | Statement: [Tom Akers, spaceMission, STS-79]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: STS-79
Context triple: [Tom Akers, spaceMission, STS-79]
  • A. STS-79 chosen
    STS-79 was a 1996 Space Shuttle Atlantis mission notable for delivering supplies to the Russian Mir space station and returning astronaut Shannon Lucid to Earth after her long-duration stay in orbit.
  • B. STS-71
    STS-71 was a 1995 NASA Space Shuttle mission that marked the first docking of a Space Shuttle with the Russian space station Mir, advancing U.S.–Russian space cooperation.
  • C. STS-49
    STS-49 was the maiden flight of the Space Shuttle Endeavour in 1992, notable for its complex satellite rescue and repair operations conducted during multiple spacewalks.
  • D. STS-74
    STS-74 was a 1995 NASA Space Shuttle mission that carried Atlantis to the Russian Mir space station to deliver supplies and a docking module as part of early Shuttle–Mir cooperation.
  • E. STS-67
    STS-67 was a 1995 NASA Space Shuttle Endeavour mission focused on ultraviolet astronomy as part of the Astro-2 observatory program.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca832b56948190ba751cec255308f1 completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cc46cc8b2081909c6aa45f8656f2ad completed March 31, 2026, 10:12 p.m.
NED1 Entity disambiguation (via context triple) batch_69d110045e6c8190b6ef9db10b5f688e completed April 4, 2026, 1:20 p.m.
Created at: March 30, 2026, 6:24 p.m.