Triple

T8591581
Position Surface form Disambiguated ID Type / Status
Subject Agreed Principles for Rafah Crossing E203439 entity
Predicate instanceOf P0 FINISHED
Object border crossing agreement C18481 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: border crossing agreement
Context triple: [Agreed Principles for Rafah Crossing, instanceOf, border crossing agreement]
  • A. border crossing
    A border crossing is a designated point where people, vehicles, and goods are legally inspected and allowed to pass from one country or jurisdiction into another.
  • B. international border crossing
    An international border crossing is a designated point where people, goods, and vehicles are legally inspected and allowed to pass between two countries.
  • C. border treaty chosen
    A border treaty is a formal agreement between two or more states that defines, clarifies, or adjusts their mutual territorial boundaries and the rules governing them.
  • D. road border crossing
    A road border crossing is a designated point along a roadway where vehicles and travelers legally pass between two jurisdictions or countries, typically featuring customs, immigration, and security controls.
  • E. state border crossing
    A state border crossing is a designated point where people, vehicles, and goods are legally inspected and allowed to pass from one state or country into another.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca832a7f108190b4e4f5648abf4aa2 completed March 30, 2026, 2:05 p.m.
Created at: March 30, 2026, 6:23 p.m.