Triple
T8586436
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ministry of Energy and Mineral Development (Uganda) |
E203316
|
entity |
| Predicate | worksWith |
P398
|
FINISHED |
| Object |
Uganda Electricity Generation Company Limited
Uganda Electricity Generation Company Limited is a state-owned utility responsible for developing, operating, and maintaining electricity generation facilities in Uganda.
|
E746123
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Uganda Electricity Generation Company Limited | Statement: [Ministry of Energy and Mineral Development (Uganda), worksWith, Uganda Electricity Generation Company Limited]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Uganda Electricity Generation Company Limited Context triple: [Ministry of Energy and Mineral Development (Uganda), worksWith, Uganda Electricity Generation Company Limited]
-
A.
Uganda Revenue Authority
The Uganda Revenue Authority is the government body responsible for tax collection and customs administration in Uganda.
-
B.
Kainji Hydro Electric Plc
Kainji Hydro Electric Plc is a Nigerian power generation company that operates major hydroelectric facilities on the Niger River, contributing significantly to the country’s electricity supply.
-
C.
Ministry of Energy and Mineral Development (Uganda)
The Ministry of Energy and Mineral Development (Uganda) is the national government body responsible for formulating and implementing policies on energy, minerals, and petroleum resources in Uganda.
-
D.
Nalubaale Power Station
Nalubaale Power Station is a major hydroelectric power plant in Uganda, located at the outlet of Lake Victoria on the Victoria Nile near Jinja.
-
E.
Bank of Uganda
Bank of Uganda is the central bank of Uganda, responsible for issuing the national currency and formulating the country’s monetary policy.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Uganda Electricity Generation Company Limited Triple: [Ministry of Energy and Mineral Development (Uganda), worksWith, Uganda Electricity Generation Company Limited]
Generated description
Uganda Electricity Generation Company Limited is a state-owned utility responsible for developing, operating, and maintaining electricity generation facilities in Uganda.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Uganda Electricity Generation Company Limited Target entity description: Uganda Electricity Generation Company Limited is a state-owned utility responsible for developing, operating, and maintaining electricity generation facilities in Uganda.
-
A.
Uganda Revenue Authority
The Uganda Revenue Authority is the government body responsible for tax collection and customs administration in Uganda.
-
B.
Kainji Hydro Electric Plc
Kainji Hydro Electric Plc is a Nigerian power generation company that operates major hydroelectric facilities on the Niger River, contributing significantly to the country’s electricity supply.
-
C.
Ministry of Energy and Mineral Development (Uganda)
The Ministry of Energy and Mineral Development (Uganda) is the national government body responsible for formulating and implementing policies on energy, minerals, and petroleum resources in Uganda.
-
D.
Nalubaale Power Station
Nalubaale Power Station is a major hydroelectric power plant in Uganda, located at the outlet of Lake Victoria on the Victoria Nile near Jinja.
-
E.
Bank of Uganda
Bank of Uganda is the central bank of Uganda, responsible for issuing the national currency and formulating the country’s monetary policy.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8329bb7c8190a63c643730839103 |
completed | March 30, 2026, 2:05 p.m. |
| NER | Named-entity recognition | batch_69cc457be9b88190bd9a2fc32350c31e |
completed | March 31, 2026, 10:06 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69cea8a51db0819097ec0f70bee31539 |
completed | April 2, 2026, 5:34 p.m. |
| NEDg | Description generation | batch_69cea996a5c48190a12ffe8e282d2d9c |
completed | April 2, 2026, 5:38 p.m. |
| NED2 | Entity disambiguation (via description) | batch_69ceadb2d52c8190aada1d797753663e |
completed | April 2, 2026, 5:56 p.m. |
Created at: March 30, 2026, 6:22 p.m.