Triple
T8575408
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Upper Atbara and Setit Dam Complex |
E203035
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | irrigation infrastructure project |
C1458
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: irrigation infrastructure project Context triple: [Upper Atbara and Setit Dam Complex, instanceOf, irrigation infrastructure project]
-
A.
irrigation dam
An irrigation dam is a barrier constructed across a watercourse to store and regulate water specifically for agricultural use, enabling controlled distribution to fields and crops.
-
B.
water management project
chosen
A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
-
C.
water transfer project
A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
-
D.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
E.
drinking water infrastructure financing program
A drinking water infrastructure financing program is a structured funding mechanism that provides loans, grants, or other financial assistance to plan, build, upgrade, and maintain public drinking water systems to ensure safe, reliable, and compliant water service.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8328ebe481909a8c038fa79959b4 |
completed | March 30, 2026, 2:05 p.m. |
Created at: March 30, 2026, 6:21 p.m.