Triple

T8575407
Position Surface form Disambiguated ID Type / Status
Subject Upper Atbara and Setit Dam Complex E203035 entity
Predicate instanceOf P0 FINISHED
Object hydropower dam complex C19469 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hydropower dam complex
Context triple: [Upper Atbara and Setit Dam Complex, instanceOf, hydropower dam complex]
  • A. hydroelectric power complex chosen
    A hydroelectric power complex is an integrated facility that harnesses the energy of flowing or falling water—using dams, reservoirs, turbines, and generators—to produce and distribute electrical power.
  • B. hydroelectric dam
    A hydroelectric dam is a large engineered structure that stores and controls river water to drive turbines and generate electricity while managing water flow and levels.
  • C. multipurpose dam
    A multipurpose dam is a large engineered barrier built across a river or stream to store and regulate water for multiple uses such as irrigation, hydropower generation, flood control, water supply, and recreation.
  • D. hydroelectric power complex vicinity
    The hydroelectric power complex vicinity is the surrounding area of a hydroelectric facility, encompassing its immediate infrastructure, environmental buffer zones, and adjacent land or water bodies influenced by its operation.
  • E. run-of-the-river hydroelectric power plant
    A run-of-the-river hydroelectric power plant is a facility that generates electricity by using the natural flow and elevation drop of a river with minimal water storage, diverting part of the river through turbines before returning it downstream.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8328ebe481909a8c038fa79959b4 completed March 30, 2026, 2:05 p.m.
Created at: March 30, 2026, 6:21 p.m.