Triple

T8571279
Position Surface form Disambiguated ID Type / Status
Subject Unionville GO Station E202930 entity
Predicate isElectrificationStatus P59679 FINISHED
Object non-electrified LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: non-electrified | Statement: [Unionville GO Station, isElectrificationStatus, non-electrified]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isElectrificationStatus
Context triple: [Unionville GO Station, isElectrificationStatus, non-electrified]
  • A. hasElectrificationStatus chosen
    Indicates that an entity possesses a specified type or level of electrification (e.g., electrified, non-electrified, partially electrified).
  • B. electrificationSystem
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • C. electrificationUsedFor
    Indicates that electrification is employed as a means or method to achieve, enable, or support a particular function, process, or purpose.
  • D. electrificationCompleted
    Indicates that the process of providing electrical power infrastructure to the relevant entity or area has been fully completed.
  • E. electrificationYear
    Indicates the year in which something (such as a system, facility, or infrastructure) was converted to or equipped for electric power.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8327b0a881908606ff860713964d completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cbea4223888190a56d9026ae0b9ec0 completed March 31, 2026, 3:37 p.m.
PD Predicate disambiguation batch_69cbd11856048190a1ce4b83a38f6965 completed March 31, 2026, 1:50 p.m.
Created at: March 30, 2026, 6:21 p.m.