Triple

T8555589
Position Surface form Disambiguated ID Type / Status
Subject Grand Finale orbits through Saturn ring plane E202554 entity
Predicate missionPhaseAfter P83604 FINISHED
Object F-ring orbits of Cassini LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: F-ring orbits of Cassini | Statement: [Grand Finale orbits through Saturn ring plane, missionPhaseAfter, F-ring orbits of Cassini]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: missionPhaseAfter
Context triple: [Grand Finale orbits through Saturn ring plane, missionPhaseAfter, F-ring orbits of Cassini]
  • A. missionPhaseTested
    Indicates that a specific mission phase has been evaluated or validated through testing.
  • B. finalMissionPhase
    Indicates that an entity is in, or corresponds to, the concluding or last phase of a mission.
  • C. missionEnd
    Indicates that a mission has concluded or reached its final state or outcome.
  • D. majorPhase
    Indicates that one phase is a primary or dominant stage within a larger process, lifecycle, or sequence.
  • E. missionAfterMerge
    Indicates that one mission occurs or is valid only after another mission has been merged or combined into it.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca832610e08190b3b6c6cd2c250255 completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cbe88a936c8190a0234bf7da2ff55a completed March 31, 2026, 3:30 p.m.
PD Predicate disambiguation batch_69cbd1160fcc8190aa380a73610af731 completed March 31, 2026, 1:50 p.m.
PDg Predicate description generation batch_69cbe30e37ac8190b685df36274602b5 completed March 31, 2026, 3:06 p.m.
Created at: March 30, 2026, 6:19 p.m.