Triple

T8545504
Position Surface form Disambiguated ID Type / Status
Subject P.B. Jones E202313 entity
Predicate workStatusContext P39444 FINISHED
Object unfinished novel LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: unfinished novel | Statement: [P.B. Jones, workStatusContext, unfinished novel]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: workStatusContext
Context triple: [P.B. Jones, workStatusContext, unfinished novel]
  • A. worksStatus chosen
    Indicates the current state or condition of an entity’s work or project, such as whether it is planned, in progress, completed, or otherwise categorized.
  • B. workPreservationStatus
    Indicates the current state or condition of efforts to preserve a particular work (such as whether it is preserved, partially preserved, or lost).
  • C. laborContext
    Indicates the labor-related circumstances, conditions, or setting within which an action, relationship, or event takes place.
  • D. workModel
    Indicates that one entity serves as, or is based on, a particular model used for work, operation, or functional behavior.
  • E. workStatusInIsrael
    Indicates the employment or legal work authorization status a person holds within Israel.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca832461e88190a654c5e44e233aa8 completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cbe74f62148190bfd6cacf5d4f74b6 completed March 31, 2026, 3:25 p.m.
PD Predicate disambiguation batch_69cbd113e05c81908f4f3fc1b5925164 completed March 31, 2026, 1:50 p.m.
Created at: March 30, 2026, 6:18 p.m.