Triple
T8509398
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Étant donnés |
E201414
|
entity |
| Predicate | title |
P38
|
FINISHED |
| Object |
Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage
Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage is a late, enigmatic installation artwork by Marcel Duchamp featuring a voyeuristic tableau viewed through peepholes in a wooden door.
|
E738412
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage | Statement: [Étant donnés, title, Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage Context triple: [Étant donnés, title, Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage]
-
A.
La Grande-2-A generating station
La Grande-2-A generating station is a large hydroelectric power plant in Quebec, Canada, that forms part of Hydro-Québec’s James Bay Project on the La Grande River.
-
B.
Les Cèdres generating station
Les Cèdres generating station is a hydroelectric power plant in Quebec, Canada, that harnesses the flow of the Saint Lawrence River to generate electricity.
-
C.
Holyoke Gas and Electric hydroelectric facilities
The Holyoke Gas and Electric hydroelectric facilities are a network of dams and power stations on the Connecticut River that generate renewable electricity for the city of Holyoke, Massachusetts.
-
D.
Beauharnois generating station
The Beauharnois generating station is a large hydroelectric power plant in Quebec, Canada, known for harnessing the flow of the Saint Lawrence River to produce electricity.
-
E.
Durance-Verdon hydroelectric system
The Durance-Verdon hydroelectric system is a major French network of dams, reservoirs, and power plants along the Durance and Verdon rivers that provides significant hydroelectric power, irrigation, and water regulation in southeastern France.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage Triple: [Étant donnés, title, Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage]
Generated description
Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage is a late, enigmatic installation artwork by Marcel Duchamp featuring a voyeuristic tableau viewed through peepholes in a wooden door.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage Target entity description: Étant donnés: 1° la chute d’eau, 2° le gaz d’éclairage is a late, enigmatic installation artwork by Marcel Duchamp featuring a voyeuristic tableau viewed through peepholes in a wooden door.
-
A.
La Grande-2-A generating station
La Grande-2-A generating station is a large hydroelectric power plant in Quebec, Canada, that forms part of Hydro-Québec’s James Bay Project on the La Grande River.
-
B.
Les Cèdres generating station
Les Cèdres generating station is a hydroelectric power plant in Quebec, Canada, that harnesses the flow of the Saint Lawrence River to generate electricity.
-
C.
Holyoke Gas and Electric hydroelectric facilities
The Holyoke Gas and Electric hydroelectric facilities are a network of dams and power stations on the Connecticut River that generate renewable electricity for the city of Holyoke, Massachusetts.
-
D.
Beauharnois generating station
The Beauharnois generating station is a large hydroelectric power plant in Quebec, Canada, known for harnessing the flow of the Saint Lawrence River to produce electricity.
-
E.
Durance-Verdon hydroelectric system
The Durance-Verdon hydroelectric system is a major French network of dams, reservoirs, and power plants along the Durance and Verdon rivers that provides significant hydroelectric power, irrigation, and water regulation in southeastern France.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8320e5748190ac2c585a0bba8193 |
completed | March 30, 2026, 2:05 p.m. |
| NER | Named-entity recognition | batch_69cbe5e0cb1881909d1ff6ee9b3a65cc |
completed | March 31, 2026, 3:18 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ce4e3faa0c81908533e9097ed29b26 |
completed | April 2, 2026, 11:08 a.m. |
| NEDg | Description generation | batch_69ce4ff9792c81908d76141904a170bc |
completed | April 2, 2026, 11:16 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69ce50acae5881908f1d2c0e21dd7f1d |
completed | April 2, 2026, 11:19 a.m. |
Created at: March 30, 2026, 6:15 p.m.