Triple

T850611
Position Surface form Disambiguated ID Type / Status
Subject Portsmouth E18376 entity
Predicate contains P35 FINISHED
Object HMNB Portsmouth E10356 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: HMNB Portsmouth | Statement: [Portsmouth, contains, HMNB Portsmouth]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: HMNB Portsmouth
Context triple: [Portsmouth, contains, HMNB Portsmouth]
  • A. HMNB Portsmouth chosen
    HMNB Portsmouth is one of the United Kingdom’s main naval bases, serving as a key operational and support hub for the Royal Navy’s surface fleet on the south coast of England.
  • B. HMNB Devonport
    HMNB Devonport is a major Royal Navy dockyard and naval base in Plymouth, England, and the largest naval base in Western Europe.
  • C. HMNB Clyde
    HMNB Clyde is a major Royal Navy base in Scotland that serves as the home of the United Kingdom’s nuclear-armed submarine fleet.
  • D. Portsmouth Naval Base
    Portsmouth Naval Base is a major Royal Navy dockyard and headquarters on England’s south coast, serving as one of the UK’s principal naval facilities.
  • E. RNAS Scapa Flow
    RNAS Scapa Flow was a key First World War seaplane and airship station in the Orkney Islands that supported the Royal Navy’s Grand Fleet operations from the major anchorage at Scapa Flow.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a4938b04208190b82e1df6b572c548 completed March 1, 2026, 7:29 p.m.
NER Named-entity recognition batch_69a4ac215194819099e6bc1b5df58fb3 completed March 1, 2026, 9:14 p.m.
NED1 Entity disambiguation (via context triple) batch_69a792a0666c8190bfc9166d45b4e867 completed March 4, 2026, 2:02 a.m.
Created at: March 1, 2026, 7:38 p.m.