Triple

T8487064
Position Surface form Disambiguated ID Type / Status
Subject Infinite Corridor E200856 entity
Predicate connects P390 FINISHED
Object MIT Building 8 E235124 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: MIT Building 8 | Statement: [Infinite Corridor, connects, MIT Building 8]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: MIT Building 8
Context triple: [Infinite Corridor, connects, MIT Building 8]
  • A. MIT Building 8 chosen
    MIT Building 8 is one of the interconnected main academic buildings on the Massachusetts Institute of Technology campus, housing classrooms, laboratories, and offices along the central Infinite Corridor.
  • B. MIT Building 54
    MIT Building 54 is a prominent high-rise tower on the MIT campus that houses the Department of Earth, Atmospheric and Planetary Sciences and is known for its meteorological and geophysical research facilities.
  • C. MIT Building 7
    MIT Building 7 is a prominent entrance and academic building on the Massachusetts Institute of Technology campus, known for its iconic neoclassical façade facing Massachusetts Avenue.
  • D. MIT Building 3
    MIT Building 3 is one of the main interconnected academic buildings on the Massachusetts Institute of Technology campus, housing classrooms, offices, and research spaces.
  • E. MIT Building 4
    MIT Building 4 is a central academic building on the Massachusetts Institute of Technology campus that houses the Institute’s Mathematics Department and various classrooms and offices.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca831d7b148190a6e32c1de43ab13b completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cbe53c4d608190a766c0e919a4b96f completed March 31, 2026, 3:16 p.m.
NED1 Entity disambiguation (via context triple) batch_69cebb5dbfc08190827e8e886a37a8be completed April 2, 2026, 6:54 p.m.
Created at: March 30, 2026, 6:13 p.m.