Triple

T8457466
Position Surface form Disambiguated ID Type / Status
Subject MP 89 E199955 entity
Predicate manufacturer P490 FINISHED
Object GEC Alsthom E264558 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: GEC Alsthom | Statement: [MP 89, manufacturer, GEC Alsthom]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: GEC Alsthom
Context triple: [MP 89, manufacturer, GEC Alsthom]
  • A. Alcatel Alsthom chosen
    Alcatel Alsthom was a major French industrial conglomerate active in telecommunications, power generation, and transport infrastructure before being restructured and rebranded as Alcatel.
  • B. Alstom (formerly Bombardier Transportation)
    Alstom (formerly Bombardier Transportation) is a major global rail transport manufacturer known for producing trains, trams, and related railway systems and equipment.
  • C. Siemens Transportation Systems
    Siemens Transportation Systems is a division of Siemens AG that designs and manufactures rail vehicles and related transportation infrastructure and technologies.
  • D. Tractebel
    Tractebel is an international engineering and consulting company specializing in energy, water, and infrastructure projects.
  • E. Systra
    Systra is a global engineering and consulting firm specializing in mass transit and rail infrastructure projects.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8318231881908fd1bc1c4d45d286 completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cbe49064f881909391d565b97e9886 completed March 31, 2026, 3:13 p.m.
NED1 Entity disambiguation (via context triple) batch_69ce88bc6b008190a93fbd41089d6c72 completed April 2, 2026, 3:18 p.m.
Created at: March 30, 2026, 6:10 p.m.