Triple

T8437832
Position Surface form Disambiguated ID Type / Status
Subject Gresik E199272 entity
Predicate hasCompany P1287 FINISHED
Object PLN Gresik power plant E628695 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PLN Gresik power plant | Statement: [Gresik, hasCompany, PLN Gresik power plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PLN Gresik power plant
Context triple: [Gresik, hasCompany, PLN Gresik power plant]
  • A. PT Pembangkitan Jawa-Bali
    PT Pembangkitan Jawa-Bali is an Indonesian power generation company that operates and manages major electricity assets, including large hydropower facilities.
  • B. PLN
    PLN is the three-letter IATA airport code for Pellston Regional Airport in Michigan, United States.
  • C. PLN
    PLN is the Polish złoty, the official national currency of Poland.
  • D. PLN
    PLN is a major social-democratic political party in Costa Rica, formally known as the National Liberation Party.
  • E. Perusahaan Listrik Negara chosen
    Perusahaan Listrik Negara is Indonesia’s state-owned electricity company responsible for generating, transmitting, and distributing electric power across the country.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8314cd6c8190a6b8c2a1096e18f3 completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cbe13446788190ad52a4fd6e8b498a completed March 31, 2026, 2:59 p.m.
NED1 Entity disambiguation (via context triple) batch_69ce1d87403c8190b979af4979e43517 completed April 2, 2026, 7:40 a.m.
Created at: March 30, 2026, 6:08 p.m.