Triple

T8432918
Position Surface form Disambiguated ID Type / Status
Subject Marvel Cinematic Universe Phase Three E199158 entity
Predicate endsWithFilm P77501 FINISHED
Object Spider-Man: Far From Home E236712 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Spider-Man: Far From Home | Statement: [Marvel Cinematic Universe Phase Three, endsWithFilm, Spider-Man: Far From Home]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Spider-Man: Far From Home
Context triple: [Marvel Cinematic Universe Phase Three, endsWithFilm, Spider-Man: Far From Home]
  • A. Spider-Man: Far From Home chosen
    Spider-Man: Far From Home is a 2019 Marvel Cinematic Universe superhero film that follows Peter Parker on a post-Endgame European trip where he faces new threats and responsibilities as Spider-Man.
  • B. Spider-Man: No Way Home
    Spider-Man: No Way Home is a 2021 Marvel Cinematic Universe superhero film that unites multiple generations of Spider-Man characters through a multiverse storyline centered on Tom Holland’s Peter Parker.
  • C. Spider-Man: Beyond the Spider-Verse
    Spider-Man: Beyond the Spider-Verse is an upcoming animated superhero film that continues the multiverse-spanning story of Miles Morales following the events of Spider-Man: Across the Spider-Verse.
  • D. Spider-Man: Across the Spider-Verse
    Spider-Man: Across the Spider-Verse is a 2023 animated superhero film that continues Miles Morales’s multiverse-spanning adventures with multiple Spider-People, acclaimed for its innovative animation and ambitious storytelling.
  • E. Spider-Man: Homecoming
    Spider-Man: Homecoming is a 2017 Marvel Cinematic Universe superhero film that follows a young Peter Parker balancing high school life with his role as Spider-Man under the mentorship of Tony Stark.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: endsWithFilm
Context triple: [Marvel Cinematic Universe Phase Three, endsWithFilm, Spider-Man: Far From Home]
  • A. endedWithFilm chosen
    Indicates that an event, series, or process concluded with the showing, release, or occurrence of a particular film.
  • B. hasStageNameInFilm
    Indicates that an individual is credited or referred to by a particular stage name in a specific film.
  • C. basedInFilm
    Indicates that something (such as a character, event, or work) is situated, set, or primarily located within the context or universe of a particular film.
  • D. filmSeriesEnd
    Indicates that a particular film marks the conclusion or final installment of a film series.
  • E. includedInFilm
    Indicates that one entity (such as a scene, segment, or element) is contained within or forms part of a particular film.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8313c99081909a5c6d83b91de5b3 completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cbe30fba4081908bfdef3faf5baceb completed March 31, 2026, 3:06 p.m.
NED1 Entity disambiguation (via context triple) batch_69ce1d673ed48190abf765c203ed2a0f completed April 2, 2026, 7:40 a.m.
PD Predicate disambiguation batch_69cbd0ec200c8190b0299e2b0b4bdcc2 completed March 31, 2026, 1:49 p.m.
Created at: March 30, 2026, 6:07 p.m.